Tuesday 20 February 2018

Wye Invader Two 2018 Winter maintenance



As 2017 came to an end, Wye Invader Two was lifted out onto hard standing for the Winter. 2017 was a busy year, out from Sharpness most weekends she travelled as far North as Upton on Severn and then Stourport, East as far as Hanham Lock via Bristol and she had several trips up the River Wye to Brockweir, unfortunately a planned trip as far as Monmouth on the River Wye was postponed at the last minute due to low water levels and inclement weather.It's now time to look at winter maintenance and we've got the following list:

  • Replace diesel fuel pipes into fuel filter

  • Replace fuel filter

  • Refill with Injector cleaner and clean diesel fuel

  • Change engine oil filter and oil

  • Replace injector leak off pipe

  • Pressure wash outside hull, check last year's KeelBlack

  • Weed hatch, remove all loose rust and old bitumen repaint with KeelBlack

  • Clean engine bay and repaint

  • Replace bilge pump

No comments:

Post a Comment